Industrial facilities don’t seem like delicate ecosystems—until the unexpected failure of one critical component threatens to grind the whole operation to a halt. Without a crystal ball, there are few ways to get ahead of these kinds of situations. That is why facilities need supply partners with the ability for fast procurement of industrial parts.
Count on Ferguson Industrial to respond quickly to emergencies, reduce downtime, and minimize revenue loss.
A chemical company found itself in an expensive pickle after losing a steam control valve in one of its mixing/finishing lines. As their preferred supplier, we were tasked with replacing the valve with the same product.
Because the failed valve shut down the entire line, the company needed a replacement in seven to 10 days. When we contacted the original equipment manufacturer to source the new valve, they quoted a six-to-seven-week lead time.
Understanding the gravity of the situation, our product experts immediately began looking for alternatives. They turned to our expansive network of manufacturer partnerships. We identified a solution in the form of Trimteck®, a domestic valve manufacturer.
There’s no obstacle we can’t overcome together.
Ferguson Industrial Offers Fast Procurement of Industrial Parts
By sourcing the Trimteck® control valve, we were able to condense the replacement timeline to five business days and save the chemical company $20,000 in production downtime. Our fast response also saved the company from storing unprocessed material in rented tanker trucks for the duration—an added cost savings of more than $33,000.
View Similiar Case Studies
Our Automated Supply Program (ASP)—an advanced, indirect material supply chain software—and our proven processes to control their MRO indirect spending reduced the total cost of ownership by 24.2% in the first year post-integration.
Our associates identified an opportunity to use our online Automated Valve Configuration Tool to build out exactly what the customer needed. In less than 15 minutes, our flow control experts were able to walk the customer through the process of configuring an FNW® automated ball valve package.
Expert technical assessment, material selection, and supply of Polypropylene at a quartz processing facility in North Carolina.